Ian Vincent Posted April 11, 2020 Report Share Posted April 11, 2020 Love the garage - Oh for one like that! Rgds Ian PS The car is pretty good as well. Quote Link to post Share on other sites
Rodbr Posted April 11, 2020 Report Share Posted April 11, 2020 Hi Ralph, You might have enough room to get the cables through perhaps a slight depression of the plate but difficult to see in the pics angle. The TR2 needs more space to allow the bulb holder to sit into the light socket on the inner wing. In effect it is two separate units. bulb holder and then rubber gasket, lens and chrome ring. not the same as later 3 and 3a. Doesn't alter the fact it's a beautiful paint job congrats. Quote Link to post Share on other sites
Ralph Whitaker Posted April 15, 2020 Author Report Share Posted April 15, 2020 On 4/11/2020 at 2:21 PM, Ian Vincent said: Love the garage - Oh for one like that! Rgds Ian PS The car is pretty good as well. Thanks Ian, its only taken 30 years. You start with the 20 by 24 foot pre-fab, then when you need more space you add a 9 by 24 foot on the side, then when you fill that after about 10 years you build a 10 by 20 foot on the other side, then add a second hand 2 post lift outside cos the garages aren`t tall enough to have it inside. Easy really. Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.